Everything is progressing along very well with the house:
- Half of the roof sheets are installed.
- Clerestory windows installed.
- Stonework completed.
- Electrical rough in started.
- Septic tank commissioned. Yes. That means we now have a working flushing toilet in the shed! Oh, how wonderfully civilized.
The snag we've hit is that the shower screen for the shed bathroom was sent without the waste/drain; which is a bit of a pain as it puts us a little bit behind schedule. Not to worry. There's still plenty of other things to do.