The roof sheets were installed last week. I can't stop staring at it, just like the Colourbond ad!
Friday, 17 May 2013
Saturday, 11 May 2013
Shed Shower Enclosure
GG put in a marathon effort today. The result? The shower enclosure in the shed bathroom is installed! Yay! We are now 99% ready for inspection and occupancy certificate.
Saturday, 4 May 2013
Progress update 4th May
Everything is progressing along very well with the house:
- Half of the roof sheets are installed.
- Clerestory windows installed.
- Stonework completed.
- Electrical rough in started.
- Septic tank commissioned. Yes. That means we now have a working flushing toilet in the shed! Oh, how wonderfully civilized.
The snag we've hit is that the shower screen for the shed bathroom was sent without the waste/drain; which is a bit of a pain as it puts us a little bit behind schedule. Not to worry. There's still plenty of other things to do.
- Half of the roof sheets are installed.
- Clerestory windows installed.
- Stonework completed.
- Electrical rough in started.
- Septic tank commissioned. Yes. That means we now have a working flushing toilet in the shed! Oh, how wonderfully civilized.
The snag we've hit is that the shower screen for the shed bathroom was sent without the waste/drain; which is a bit of a pain as it puts us a little bit behind schedule. Not to worry. There's still plenty of other things to do.